ETP, STP, WTP ডিজাইন, Installation এবং DOE ছাড়পত্র — শুরু থেকে শেষ পর্যন্ত

+880 1338-950649 team.waterexchange@gmail.com
Water ExchangeWater Exchange
HomeAboutServicesProductsExpertiseClientsBlogContact
Free consultation
Water Exchange

A high-end environment consultancy firm in Bangladesh — ETP, STP and WTP design and installation, plus Department of Environment (DOE) water testing and clearance, from start to finish.

House# 396 (4th Floor), Road# 29, New DOHS Mohakhali, Dhaka 1212
team.waterexchange@gmail.com
+880 1338-950649

Explore

  • Home
  • About
  • Services
  • Products
  • Expertise
  • Clients
  • Blog
  • Contact
  • FAQ

Key services

  • Environment Management
  • Environment Report
  • Environmental Design & Drawing
  • Chemical & Machineries
  • Captive Power Plants (CPPs)
  • Environmental Sustainability Research

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • Refund Policy

Worked with

  • UNDP
  • JICA
  • BRAC
  • IFRC
  • NGO Forum for Public Health

© 2026 Water Exchange. Water & Beyond. All rights reserved.

HomeBlogWater Treatment

Why Your Building Needs a Sewage Treatment Plant — and How to Size One

Hospitals, apartment blocks and commercial buildings produce sewage every hour. A properly sized STP protects public health and keeps approvals on track.

  • Water Exchange
  • 24 Sept 2026
  • 1 min read

Sewage from toilets, kitchens and bathrooms carries pathogens and organic load that should never reach drains or water bodies untreated. For hospitals, residential towers, hotels and factories with large workforces, a sewage treatment plant (STP) is the practical answer.

An ETP is not an STP

Factories sometimes assume their effluent treatment plant can take domestic sewage as well. The two waste streams are very different, and mixing them upsets the treatment process. Domestic sewage needs its own STP.

How an STP is sized

Sizing starts with the population the building serves and the expected water use per person. From there the engineer works out:

  • The daily flow and the peak hourly flow
  • The organic load (BOD) the biological stage must remove
  • The tank volumes and the air the blowers must supply
  • The space available — compact designs suit basements and tight plots

Choosing the technology

Conventional activated sludge works well where space allows. Where it does not, compact packaged systems, moving-bed bioreactors or membrane systems treat the same load in a fraction of the footprint.

Operation decides performance

Even a well-designed STP fails without care. Blowers must run on schedule, sludge must be removed regularly, and the treated water should be tested periodically.

We design STPs for buildings of every size, prepare the drawings for approval and install and commission the plant on site.

  • #STP
  • #Buildings
  • #RAJUK

Keep reading

Related articles

  • Water Treatment

    20 Oct 2026· 2 min read

    How an Effluent Treatment Plant Works: A Step-by-Step Guide for Factory Owners

    From the equalization tank to the final clarifier — what happens to your wastewater at each stage of an ETP, and why every stage matters for DOE compliance.

    Read article

Planning an ETP, STP or WTP?

Talk to an engineer today — we’ll guide you from design and installation to DOE clearance.

+880 1338-950649
Back to all articles

Need help with this?

Talk to our engineers about your plant, clearance or water test — the first consultation is free.

Get in touch +880 1338-950649
Water Treatment

27 Aug 2026· 1 min read

Roots Blower or Turbo Blower? Choosing the Right Aeration Blower

Aeration is often the largest electricity cost in a treatment plant. Here is how Roots and turbo blowers compare, and when each one makes sense.

Read article
  • Water Treatment

    15 Jul 2026· 1 min read

    Zero Liquid Discharge: Is It Right for Your Textile Factory?

    Zero liquid discharge recycles almost all of a factory’s wastewater. It saves groundwater but needs careful planning. Here is what is involved.

    Read article
  • Send a message