ETP, STP, WTP ডিজাইন, Installation এবং DOE ছাড়পত্র — শুরু থেকে শেষ পর্যন্ত

+880 1338-950649 team.waterexchange@gmail.com
Water ExchangeWater Exchange
HomeAboutServicesProductsExpertiseClientsBlogContact
Free consultation
Water Exchange

A high-end environment consultancy firm in Bangladesh — ETP, STP and WTP design and installation, plus Department of Environment (DOE) water testing and clearance, from start to finish.

House# 396 (4th Floor), Road# 29, New DOHS Mohakhali, Dhaka 1212
team.waterexchange@gmail.com
+880 1338-950649

Explore

  • Home
  • About
  • Services
  • Products
  • Expertise
  • Clients
  • Blog
  • Contact
  • FAQ

Key services

  • Environment Management
  • Environment Report
  • Environmental Design & Drawing
  • Chemical & Machineries
  • Captive Power Plants (CPPs)
  • Environmental Sustainability Research

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • Refund Policy

Worked with

  • UNDP
  • JICA
  • BRAC
  • IFRC
  • NGO Forum for Public Health

© 2026 Water Exchange. Water & Beyond. All rights reserved.

HomeBlogCompliance

Stack Emission Monitoring: Keeping Industrial Air Pollution in Check

Boilers, generators and process stacks release gases that the DOE expects you to measure and control. Here is how emission monitoring works.

  • Water Exchange
  • 19 May 2026
  • 1 min read

Water is only part of the environmental picture. Boilers, captive power generators and process stacks release smoke and gases that affect workers and neighbours alike.

What is measured

  • Particulate matter (dust and soot)
  • Sulphur dioxide and nitrogen oxides
  • Carbon monoxide
  • Stack temperature and gas flow

Ambient air and noise

Besides the stack itself, monitoring often covers the air quality and noise levels around the site, especially for captive power plants and factories near homes.

Controlling emissions

  • Burner tuning and regular maintenance of boilers and generators
  • Cleaner fuels where possible
  • Dust collectors, cyclones or scrubbers for specific processes
  • Correct stack height so emissions disperse safely

Records for clearance renewal

Monitoring results are part of the reports submitted for environmental clearance renewal, particularly for captive power plants. Regular measurement also shows when equipment needs attention before it fails.

We arrange stack and ambient air monitoring and have secured clearance for more than twenty gas and diesel power plants.

  • #Air quality

Keep reading

Related articles

  • Compliance

    8 Oct 2026· 1 min read

    Getting an Environmental Clearance Certificate from the DOE: What You Need to Know

    Every industrial unit in Bangladesh needs an Environmental Clearance Certificate. Here is how the category of your project shapes the process and the documents you will need.

    Read article

Planning an ETP, STP or WTP?

Talk to an engineer today — we’ll guide you from design and installation to DOE clearance.

+880 1338-950649
  • #Emissions
  • #Generators
  • Back to all articles

    Need help with this?

    Talk to our engineers about your plant, clearance or water test — the first consultation is free.

    Get in touch +880 1338-950649
    Compliance

    10 Sept 2026· 1 min read

    pH, BOD, COD and TSS: The Water Test Parameters Explained

    Your water test report is full of abbreviations. This plain-language guide explains what each key parameter measures and what a bad result usually means.

    Read article
  • Compliance

    30 Jun 2026· 1 min read

    Environmental Impact Assessment (EIA): What It Involves and Why It Matters

    Large projects need an EIA before they get environmental clearance. Here is what the study covers and how it shapes a better project.

    Read article
  • Send a message